MarkSmart Field Marking Systems
Description
Install sockets with pilot tool and rubber mallet.
1) Insert the lining pegs into the sockets.
2) String a plumb line.
3) Sockets hold game-day markers, flags, pylons, etc.
Call for information on other kits or replacement parts.
BASEBALL-SOFTBALL SET: (Includes 6 sockets with plugs,
1 pilot hole tool, 8 lining pegs, 638' nylon
twine.)
SOCCER SET: (Includes 25 sockets with plugs, 1 pilot
tool, 6 lining pegs, 638' nylon twine, 4 spring-loaded
60"H flags and 1 storage bag.)
230-765-039 230-765-319
